Why Do Low Bids Often End Up Costing You More?

In the photo on the left, an elderly woman was left with an unfinished deck and railing from a low-bid contractor that abandoned the job. Furthermore, the contractor had used Douglas Fir – which is not rot resistant – and paracord rather than stainless steel cable for the railing. Therefore, the railing, specifically intended to

Read More »

TIMELY PROJECT DELIVERY

The Biggest Construction-Industry Challenge is Also Major Client Pain Point Hilary Gennaro, 12/22/25 One of the biggest challenges any construction company faces is ensuring timely project delivery. It is such a pervasive problem, in fact, that performance data from 2024-2025 (according to Buildern.com) reveals that large projects can run as much as 20% behind schedule

Read More »
Scroll to Top